Viewing entries tagged with 'pumps'

Air monitoring, where do you place the pumps?

Posted by Luke Austin on 25 August 2017 | 0 Comments

Tags: , , , ,

The aim in undertaking air sampling is to get a realistic sample of the air that people are breathing. As this is a scientific process we need to ensure that we can as much as possible have confidence in our results.

0 comments | Read the full post

How do you determine the number of air monitoring pumps required when undertaking asbestos removal?

Posted by Luke Austin on 31 July 2016 | 0 Comments

Tags: , , ,

The aim of the air monitoring during asbestos removal works is to follow the potential air flow patterns around a project and then to be in a position to confirm that the air is all safe for the public to breath.

0 comments | Read the full post